Water Levels and Production

Date
Static Water Level
Yield
Date: 05/10/2011
Static Water Level: 26.00 ft
Yield: 40 gallons per minute
Date
05/10/2011 
Start Time
14:00 
Aquifer
Unknown 
Static Water Level
26.00 ft
Yield
40 gallons per minute
Pumping Water Level
140 ft
Yield Method
Estimate
Measurement
Tape 
Pump Test
Yes
Pump Method
Pumped 
Duration
360 mins
Comments