Water Levels and Production

Date
Static Water Level
Yield
Date: 08/05/2010
Static Water Level: 24.00 ft
Yield: 150 gallons per minute
Date
08/05/2010 
Start Time
13:00 
Aquifer
Unknown 
Static Water Level
24.00 ft
Yield
150 gallons per minute
Pumping Water Level
60 ft
Yield Method
Estimate
Measurement
Tape 
Pump Test
Yes
Pump Method
Pumped 
Duration
1440 mins
Comments
Formal pump test on file.