Breadcrumb Home All News UI hydroscience engineers demonstrate model for $26 million flood mitigation project A smaller model, costing $250,000 and built by the UI, was shown publicly for the first time on Monday at the UI Hydraulics Annex 2. Tuesday, August 26, 2025 The Daily Iowan https://dailyiowan.com/2025/08/25/university-of-iowa-hydroscience-engineers-dem…